Not sure what to look at on site?Stage checklists
I want to check the work before I pay the next stage.
- 1 Land
- 2 Design
- 3 Site & slab
- 4 Frame
- 5 Fixing
- 6 Handover
- 7 Living
Plain-English guides and stage-by-stage inspection checklists, so you can spot problems while they're still cheap to fix. From Anthony Painter, a Brisbane builder and waterproofer with 26 years on residential sites, independent of any builder.
We're looking at landFree C1 checklist, then what the house will cost
We're choosing a builderQuestions to ask every builder, and plan the cost
We're building nowPick your stage: what to check before you pay
Something on site doesn't look rightFree NCR Form, and the forms to put it in writing
We're worried the money won't stretchThe four money tools, one for each point in the build
We've just got the keysHandover, the defects period and the maintenance calendar
Free guide: design and contract in five steps · Plan the cost (C24)
See C4 Asking the Right QuestionsStart with the money: estimate your build (C27) · Free guide: the Build Money Ledger and how it works
Find your money toolBuying an existing home? See C21 Pre-Purchase Inspection.
Pick your stage. You'll get the checklists for it, what to check before you pay, and the guides worth reading now.
Before you buy a block or sign anything.
Plans, inclusions and the contract.
Site works, footings and the slab. This is the stage to slow down.
Frame, roof, windows and rough-in.
Waterproofing, tiling, joinery and paint. What you see every day for the next 20 years.
Practical completion and the final payment.
Your first year and beyond. The 12-month defects period starts at practical completion. Check your contract.
For you if you're thinking about building and want the whole picture before you talk to builders.
Building Without Regret walks you through every stage of a new home, from the first sales meeting to your first year living in it. It's about preventing defects through knowledge, not finding them after they're built: what to check, what to ask, and when to push back, from 26 years on residential sites.
Get an email when it's on sale
One email when the book goes on sale. No newsletter.
Includes a free digital edition and 25% off The Complete Set of checklists. Scan the QR code inside to claim both.
Pick the problem you have. Each one opens the section that solves it.
I want to check the work before I pay the next stage.
I want to know what it'll cost, and that we'll have enough to finish.
I need to put a problem, question or variation in writing.
I like to read ahead, with drawings of what good looks like.
I want a record of every visit, then a plan once we move in.
I want the Build Planner, the NCR Form or CINS tags.
A real build written up as it happens, and new guides every week.
A real build written up as it happens, from demolition and sheet piling to footings, with what went right and what didn't.
Read the diary →Free, plain-English guides from 26 years on residential building sites. New posts every week.
Post 58: Pour Day for the Rediwall Core Fill
Pour day for the Rediwall basement walls. A 47 m boom pump, three lifts all the way round, vibrating with hammer drills on timber blocks, tapping the walls, conduits taped and marked, L bars set to height, and a pump parked on the neighbour's lawn.
Post 57: Ready for the Core Fill in the Rediwall Basement Walls
The day before the Rediwall basement walls are filled with concrete. Back-propping and bracing, a lintel waiting on steel, a boatload of L bars to tie the walls to the ground floor slab, conduits cast in for power and data, the column cages, the special core fill mix, and what happens next.
Post 56: Getting the Steel into the Rediwall Basement Walls
A quick look at how the steel goes into the Rediwall basement walls. Cutting the walls to height, dropping N16 verticals from a scissor lift, the hooked bars that tie each corner together, the lintels over the ventilation windows, conduits cast in for EV charging, and the bracing before the pour.
Extension of Time and Building Delays: What Homeowners Need to Know
When a build runs late, an extension of time claim usually lands in your inbox. Here's what Queensland law requires of your builder, how to check each claim, and how to keep the record that protects you.
Join free for trade guides, downloads and the free C1 checklist. No spam.