Constructor

For Australians building a new home

Know what to check before you pay the next stage.

Plain-English guides and stage-by-stage inspection checklists, so you can spot problems while they're still cheap to fix. Explaining what builders don't.

C1 Before Buying Land is free. Just your email, no card.
505free guides
25checklists
3,500+individual checks

Where are you in your build?

Pick your stage. You'll get the checklists for it, what to check before you pay, and the guides worth reading now.

Latest guides

More guides →
C23 Concrete Driveways and Paths checklist cover with a sketch of driveway joint layout Checklists12 Oct 20266 min C23: The Concrete Driveways and Paths Checklist A 140-check fillable checklist for new home owners, from the first quote to the defects period: base, mesh, joints, curing, problems and sealing, with 19 sketches. Constructor Quality Forms Starter Pack with the question to builder, NCR and progress claim check forms Checklists12 Oct 20265 min Quality Forms Starter Pack: 17 Forms for Checking Your Own Build 17 quality forms for homeowners, from the non-conformance report to the site instruction, each as a print-ready PDF and an editable Word file. The Constructor Field Manual: Know What to Ask, Before You Need to Ask It Checklists11 Oct 20266 min The Constructor Field Manual: Know What to Ask, Before You Need to Ask It A year ago we said our checklists were chonky, and promised to break them down. This is it: every check by stage, with what good looks like, so you know what to ask before you need to ask it. The sewer and stormwater tanks formed in white Rediwall permanent formwork, with the first layers of slab steel around them Before Construction10 Oct 20267 min Post 46: Steel Fixing, Tanks Formed and Waterproofing Details The first 18 tonnes of slab steel are craned in, the sewer and stormwater tanks are formed in Rediwall, and the water stops and Sika waterproofing are being detailed before the tanks are backfilled. The Constructor Site Diary: Your Own Record of the Build Checklists10 Oct 20266 min The Constructor Site Diary: Your Own Record of the Build Builders keep a site diary. The Constructor Site Diary is yours: a one-page record for every visit, a weekly wrap, and a stage gate before every payment, so you have dates, names and photos to point to if a question comes up. The finished blinding slab inside the steel sheet piling, with blue set-out lines for the basement walls and grids Before Construction10 Oct 20266 min Post 45: Blinding Down, Set-Out Done and Planning the Tanks The blinding slab is down and set out, the sewer and stormwater tank walls have arrived, and the waterproofing for the tanks and basement walls is being designed ahead of a 250 m³ monolithic pour.

One checklist for every stage

Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.

See all 25 checklists →
Start here

C1 Before Buying Land

Free
  • Check the block before you buy or sign
  • Email only, no card
Get it free
Bundle

Land to Slab

$269save $86
  • Every check from buying land to the slab
  • The stage where hidden problems get buried
View bundle
Best value

The Complete Set

$629AUD
  • All 25 checklists, land to maintenance
  • Includes The Trade Tool and CINS
Get the Complete Set
Build diary · 46 posts

Follow the Project 1 build

A real build written up as it happens, from demolition and sheet piling to footings, with what went right and what didn't.

Read the diary →
  1. NewPost 46: Steel Fixing, Tanks Formed and Waterproofing Details
  2. NewPost 45: Blinding Down, Set-Out Done and Planning the Tanks
  3. AllSee all 46 diary posts →